|
|
|
|
|
|
|
|
COMPANY PROFILE & QUALIFY EMPLOYED |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
1 |
NAME OF THE FIRM |
R P CRANES & HOIST |
|
|
|
|
| |
|
|
|
|
|
|
2 |
LOCATION |
G. NOIDA |
|
|
|
|
| |
|
|
|
|
|
|
2.1 |
Postal Address |
|
|
|
|
|
|
a) Regd. Office |
B-92, Sector-22 |
|
|
|
|
|
Noida-201 301. |
|
|
|
|
|
|
|
|
|
|
|
|
b) Work/ Factory |
G-109, Site-B, |
|
|
|
|
|
|
Surajpur Industrial Area |
|
|
|
|
|
Gearter Noida |
|
|
|
|
| |
|
|
|
|
|
|
2.2 |
Telephone Numbers |
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Head Office |
0120-4348076, 9350500628 |
|
|
|
b) Work/ Factory |
9350277254, 9810063773 |
|
|
|
|
|
|
|
|
|
|
2.3 |
Telefax/Email ID |
|
|
|
|
|
|
a) Head Office |
0120-4348076 |
|
|
|
|
|
b) Work/ Factory |
0120-4348076, rpcranes2001@rediffmail.com |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
3 |
Descriptions of Factory/Works |
|
|
|
|
|
|
a) Total Land Area in sq. M |
450 Sq. Meters |
|
|
|
|
b) Total Covered Area |
300 Sq. Meters |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
4 |
Number of Personeels employed (Category Wise) |
|
|
|
|
|
|
|
|
|
|
|
|
a) Managerial |
3 Nos. |
1) Diploma Mechanical |
|
|
|
2) Diploma Mechanical |
|
|
|
3) MBA & Diploma in Mechanical |
|
|
|
|
|
|
|
|
b) Supervisory |
3 Nos. |
1) Diploma Electrical
2) Diploma Mechanical |
|
|
|
|
|
|
3) Graduate |
|
c) Skilled Artisans |
8 Nos. |
|
|
|
|
|
d) Unskilled |
5 Nos. |
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
5 |
General Information Technical |
|
|
|
|
|
| |
|
|
|
5.1 |
Description of different department |
Marketing, Production, Quality Control |
|
|
in the factory/works and function of |
Inspection, Purchase, Maintenance, |
|
|
|
each department along with an |
Personeel & Administration. |
|
|
|
organisation chart. |
Function related to their respective day to wok. |
|
|
Detailed description of machinery |
1. Lathe Machine = 3 Nos. |
|
|
|
and plant in each department. |
2. Slotter |
|
|
|
|
|
|
3. Milling Machine |
|
|
|
|
|
4. Pug Cutting Machine |
|
|
|
|
|
5. Generator 62 KVA |
|
|
|
|
|
5. Generator 25 KVA |
|
|
|
|
|
6. Dril Machine |
|
|
|
|
|
|
7. Grinder |
|
|
|
|
|
|
8. Hydraulic press |
|
|
|
|
|
9. Safer |
|
|
|
|
|
|
10. Load Testing Arrangement |
|
|
|
|
11. Welding Machines |
|
|
|
|
|
12. Other Testing Equipments |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
5.3 |
Details of raw-material held in stock |
Steel Plate, Chennel, Section. |
|
|
|
|
Gears, Gear Boxes, Motors, |
|
|
|
|
Brake & other Electric Goods |
|
|
| |
|
|
|
|
|
|
5.4 |
Production Capacity |
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Per Month |
1-2 Crane, 2-3 Electric Hoist |
|
|
|
b) Per Year |
10-15 Cranes, 24-30 Hoists |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
5.5 |
List of other items which firm |
Hydraulic Items, Stacker, Lifting Table, |
|
|
regularty manufacturers |
Mobile Floor Crane, Jib Crane - 20-25 Per Year |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
6 |
Design Capability |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
6.1 |
Details of Qualified Personnel |
Design Department is headed by a person |
|
|
|
having eight year experience in crane line. |
|
|
|
He is assisted by a Draughtmen who is |
|
|
|
Diploma in Mechanical Engg. |
|
|
|
|
|
|
|
|
|
6.2 |
Other Facilities Available |
Chemical Lab for chemical elements testing |
|
|
|
D.P. Test |
|
|
|
|
|
|
Electrical Sequence testing, High Voltage |
|
|
|
testing, Load Testong, |
|
|
|
| |
|
|
|
|
|
|
7 |
Manufacturing Process |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
7.1 |
Level of in-hours facilities |
we are having all facilities manufacture |
|
|
|
Quality Cranes and Hoist |
|
|
|
|
|
|
|
|
|
|
7.2 |
Important items of works done by |
Heat Treatment, Chemical Testing form |
|
|
out side vendor |
reputed laboratories. |
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
8 |
Quality Assurance |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
8.1 |
Is Firm Certified for ISO 9000 or |
|
|
|
|
|
|
equivalent |
|
|
|
|
|
|
|
We are adhering to quality assurance |
|
|
|
program strickly as per Indian Standard |
|
|
|
IS 3177 & IS 807, 800 for Crane. |
|
|
|
|
IS 3938 for Electric Wire Rope Hoist |
|
|
|
|
|
|
|
|
|
8.2 |
Details of Quality Assurance |
Quality Control Department is headed |
|
|
Organisation name of key personnel |
by a qualified Q.C. Manager ans Assisted |
|
|
their qualification, designation and |
by to quality inspector. |
|
|
|
|
position in overall management |
|
|
|
|
|
|
structure. |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
8.3 |
Quality Control Testing Facilities |
Chemical Test Apparatus Chemical and |
|
|
|
testing instruments |
|
|
|
|
|
Electrical Sequence Testor |
|
|
|
|
High Voltage Testor |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
8.4 |
Available of Guages |
Vernier Caliper, Micrometer, Hardness tester |
|
|
|
inside Caliper, Outside Caliper, Filler Guages, |
|
|
|
Inside Micrometer, Bevel Protractors. |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
8.5 |
Calibration of Laboratory/ Test |
Calibration of test/lab equipments/guages |
|
|
Equipments/Guages |
is done by in house by Q.C. Manager. He keeps |
|
|
|
a record of such tests. Duration of tests is |
|
|
|
after every six months. The instruments are |
|
|
|
changed is not in have a good condition. |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
8.6 |
Source Procurement of Raw-Material |
We generally procrue raw meterials from |
|
|
important bought-outs and steps |
manufacturers/authorised dealers & stockists |
|
|
taken to ensure their quality |
|
|
|
|
|
|
|
Steel is procured from SAIL through authorised |
|
|
|
stockists, dealers alongwith relevent test |
|
|
|
certificate. |
|
|
|
|
|
|
Brought-outs item ready to fit in crane |
|
|
|
are bought from reputed manufacturers/ |
|
|
|
stockists, dealers alongwith relevent test |
|
|
|
certificate. |
|
|
|
|
|
|
These items/sub assemblies are checked by |
|
|
|
inspectors as per our requriement |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
8.7 |
Details of Inspection/check done |
Visual Inspection |
|
|
|
|
on material during various stage of |
Dimensional Inspection |
|
|
|
|
above manufacturers process |
Chemical testing of various elements |
|
|
|
|
Hardness tests |
|
|
|
|
|
Electrical Test |
|
|
|
|
|
|
Diagonal tests |
|
|
|
|
|
|
Hook Approch tests |
|
|
|
|
|
Alignment checks |
|
|
|
|
|
Running trials for gear boxes |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
8.8 |
Have acceptable value for the |
Yes as per IS 3177 & 807 |
|
|
|
|
parameters inspected during above |
|
|
|
|
|
|
stage check have been laid down? |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
8.9 |
Systems for documention of the |
the documents of all checks done are maintained |
|
|
Results of above stage checks |
till the job is completed and then it forms a |
|
|
|
part of history file which is maintained in our |
|
|
|
records for future reference. |
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
9 |
After Sales-Service |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
9.1 |
Facilities available at works and |
Maintenance and servicing personnel |
|
|
|
Branch office |
are available at works & after sale |
|
|
|
|
service is provided from our works |
|
|
|
|
with readily available stock of fast moving |
|
|
|
spare parts |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
9.2 |
Assessment of Quality of service |
Any problem is being attended to in shortest |
|
|
|
possible time by our service engineers. |
|